Question
Download Solution PDFIf 6 men and 8 boys can do a piece of work in 10 days, while 26 men and 48 boys can do the same in 2 days, the time taken by 25 boys in doing the same type of work will be:
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFGiven:
6 men and 8 boys can do a piece of work in 10 days.
26 men and 48 boys can do the same work in 2 days.
Formula Used:
Work done (W) = Number of workers × Time
Calculation:
Let's assume 1 man's 1 day work = M and 1 boy's 1 day work = B.
We have two equations:
6M + 8B = W/10 ⇒ 60M + 80B = W ---- (1)
26M + 48B = W/2 ⇒ 52M + 96B = W ---- (2)
Equating both equations:
60M + 80B = 52M + 96B
⇒ 8M = 16B
⇒ M = 2B
Substituting M = 2B in equation (1):
60(2B) + 80B = W
⇒ 120B + 80B = W
⇒ 200B = W
Now, we need to find the time taken by 25 boys to complete the work:
Work done by 25 boys in 1 day = 25B
Total Work = 200B
Time taken by 25 boys = Total Work / Work done per day
⇒ Time = 200B / 25B
⇒ Time = 8 days
The correct answer is option 4.
Last updated on Jun 16, 2025
-> The RRB Technician 2025 Vacancies have been announced in the Employment Newspaper.
-> As per the Notice, around 6180 Vacancies will be announced for the Technician 2025 Recruitment.
-> The Online Application form for RRB Technician will be open from 28th June 2025 to 28th July 2025.
-> The Pay scale for RRB Technician posts ranges from Rs. 19900 - 29200.
-> Prepare for the exam with RRB Technician Previous Year Papers.