Primary distribution is carried out by _____________. 

This question was previously asked in
SSC JE Electrical 14 Nov 2022 Shift 3 Official Paper
View all SSC JE EE Papers >
  1. single phase two wire system
  2. single phase three wire system
  3. two phase three wire system
  4. three phase three wire system

Answer (Detailed Solution Below)

Option 4 : three phase three wire system
Free
RRB JE CBT I Full Test - 23
14.3 K Users
100 Questions 100 Marks 90 Mins

Detailed Solution

Download Solution PDF

Single line diagram of power system

SSC JE Electrical 87 21Q Jan 25th Second Shift Hindi images Q1

Stage of power system

Voltage Level

Generation

11 kV

Primary transmission

132 kV / 220 kV

Secondary transmission

66 kV

Primary distribution

11 kV / 6.6 kV

Secondary distribution

440 V / 220 V

 

The primary distribution is carried out by a 3-phase 3-wire system.

Primary distribution handles large consumers such as factories and industries which need voltage in kV which is possible only 3-phase 3-wire system.

If it is carried out with 1ϕ, then there are chances of voltage drop.

Latest SSC JE EE Updates

Last updated on Jun 16, 2025

-> SSC JE Electrical 2025 Notification will be released on June 30 for the post of Junior Engineer Electrical/ Electrical & Mechanical.

-> Applicants can fill out the SSC JE application form 2025 for Electrical Engineering from June 30 to July 21.

-> SSC JE EE 2025 paper 1 exam will be conducted from October 27 to 31. 

-> Candidates with a degree/diploma in engineering are eligible for this post.

-> The selection process includes Paper I and Paper II online exams, followed by document verification.

-> Prepare for the exam using SSC JE EE Previous Year Papers.

More Transmission and Distribution Questions

Get Free Access Now
Hot Links: teen patti cash game teen patti 50 bonus teen patti winner teen patti master apk download teen patti boss