Question
Download Solution PDFIf a house must be installed with 8 power socket outlets, then the total number of power sub-circuits required is:
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFExplanation
As per IEEE, a maximum number of 2 power socket outlets must be present in a single power sub-circuit.
1 power sub-circuits = 2 power socket outlets
So for 8 power socket outlets, 4 power sub-circuits are required.