Download Solution PDFWhich one of the following pairs is not correctly matched regarding peculiarities of Ramganga project?
This question was previously asked in
UPPSC PCS Prelims 2024 Official GS Paper-I
Answer (Detailed Solution Below)
Option 3 : Dam's length - 825.8 metres
Free Tests
View all Free tests >
70th BPSC CCE Exam Mini Free Mock Test
58.7 K Users
75 Questions
75 Marks
60 Mins
Detailed Solution
Download Solution PDFThe correct answer is option 3.
Key Points
- Hydropower generation capacity - 198 MW
- ✅ Correct – The Ramganga Project has a hydropower generation capacity of 198 MW.
- Location - Garhwal (Uttarakhand)
- ✅ Correct – The Ramganga Dam is located in the Pauri Garhwal district of Uttarakhand.
- Dam's length - 825.8 metres
- ❌ Incorrect – The actual length of the Ramganga Dam is 630 metres, not 825.8 metres.
- Irrigated area - 6 lakh hectares
- ✅ Correct – The Ramganga Project provides irrigation to approximately 6 lakh hectares of agricultural land.
Last updated on Jun 21, 2025
-> UPPCS Mains Admit Card 2024 has been released on 19 May
-> UPPCS Mains Exam 2024 Dates have been announced on 26 May.
-> The UPPCS Prelims Exam is scheduled to be conducted on 12 October 2025.
-> Prepare for the exam with UPPCS Previous Year Papers. Also, attempt UPPCS Mock Tests.
-> Stay updated with daily current affairs for UPSC.
-> The UPPSC PCS 2025 Notification was released for 200 vacancies. Online application process was started on 20 February 2025 for UPPSC PCS 2025.
-> The candidates selected under the UPPSC recruitment can expect a Salary range between Rs. 9300 to Rs. 39100.