The total float on the critical path in CPM is _________.

This question was previously asked in
MP Vyapam Sub Engineer 2 Sept. 2018 shift 1 (Mechanical Engineering) Official Paper
View all MP Vyapam Sub Engineer Papers >
  1. negative
  2. positive fraction
  3. positive
  4. zero

Answer (Detailed Solution Below)

Option 4 : zero
Free
Building Materials for All AE/JE Civil Exams Mock Test
20 Qs. 20 Marks 20 Mins

Detailed Solution

Download Solution PDF

Explanation:

Critical Path:

  • The longest path in the network diagram is called the Critical Path.
  • The length of the Critical Path determines the minimum duration required for the completion of the project.

Critical activity:

  • Critical activities are those activities that lie on critical path.
  • The float of activities that lie on the critical path is zero.

Float:

  • Relax or delay provided to any activity is known as float.

Floats are of three types. They are as follows:

Total Float (TF):

The maximum delay or relax provided to any activity without affecting the project duration.

TF = Lj – Ei – dij

Free Float (FF):

Relax or delay provided to any activity without affecting the Earliest Start Time (EST) of the successor activity.

FF = Ej – Ei – dij

Independent Float:

Relax or delay provided to any activity without affecting the Earliest Start Time (EST) of successor activity as well as Latest Finish Time (LFT) of the predecessor activity.

IF = Ej – Li - dij

Relation among float TF ≥ FF ≥ IF

On the Critical path, total, free, and independent float are all equal and zero.

Latest MP Vyapam Sub Engineer Updates

Last updated on Dec 5, 2024

-> MP Vyapam Sub Engineer Recruitment 2024 Result has been declared for the exam which was held from 19th September 2024 onwards. 

-> A total of 283 vacancies have been announced. Candidates had applied online from 5th to 19th August 2024.

-> The MP Vyapam Sub Engineer exam aims to recruit individuals for Sub Engineer positions across various government departments in Madhya Pradesh.

-> Candidates can check MP Vyapam Sub Engineer Previous Year Papers for better preparation!

More Operations Research Questions

Hot Links: teen patti earning app teen patti star teen patti game online