On which one of the following rivers is the Tehri Hydropower Complex located?

This question was previously asked in
Patna High Court Mazdoor Official Paper (Held On: 22 Jun, 2025)
View all Patna High Court Mazdoor Papers >
  1. Alaknanda
  2. Bhagirathi
  3. Dhauliganga 
  4. Mandakini

Answer (Detailed Solution Below)

Option 2 : Bhagirathi
Free
Patna High Court Mazdoor: ST 1 General Knowledge & Awareness
2.1 K Users
20 Questions 20 Marks 48 Mins

Detailed Solution

Download Solution PDF

The correct answer is Bhagirathi.

Key Points

  • The Tehri Hydropower Complex is located on the Bhagirathi River, a major tributary of the Ganges in Uttarakhand, India.
  • It is one of the largest hydropower projects in India, with a total installed capacity of 1,000 MW (Tehri Stage I), and additional capacities from its pumped storage and downstream projects.
  • The project was developed by the Tehri Hydro Development Corporation (THDC), a joint venture between the Government of India and the Government of Uttarakhand.
  • The Tehri Dam, part of the complex, is a multi-purpose rock and earth-fill dam with a height of 260.5 meters, making it one of the highest dams in the world.
  • This hydropower project contributes significantly to power generation, irrigation, and drinking water supply in northern India.

Additional Information

  • Bhagirathi River:
    • It originates from the Gangotri Glacier in the Garhwal Himalayas and is considered one of the headstreams of the Ganges.
    • The Bhagirathi merges with the Alaknanda River at Devprayag to form the holy Ganges River.
  • Tehri Dam:
    • It is a significant component of the Tehri Hydropower Complex and provides water for drinking, irrigation, and hydroelectric power generation.
    • The dam creates the Tehri Reservoir, which has a gross storage capacity of 3.54 billion cubic meters.
  • Environmental Impact:
    • The construction of the Tehri Dam was controversial due to concerns about seismic activity in the region and the displacement of local communities.
    • Extensive rehabilitation and resettlement measures were undertaken to address the displacement of over 100,000 people.
  • Pumped Storage Component:
    • The Tehri Hydropower Complex includes a 1,000 MW pumped storage scheme, which helps in meeting peak power demand by storing energy during off-peak hours and releasing it during peak periods.
Latest Patna High Court Mazdoor Updates

Last updated on Jun 17, 2025

-> The Patna High Court Mazdoor 2025 Call Letter has been released on 16th June 2025.

-> A total of 171 vacancies have been released.

-> 8th/10th/12th-pass candidates are eligible for this post.

-> Applications for this recruitment were submitted online by 18th March 2025.

-> The selection process includes a Written Test, Cycling Test, Skill Test, and Interview.

-> The finally appointed candidates will be entitled to salary in the pay scale of INR 14800 to INR 40300 (Level -1).

Get Free Access Now
Hot Links: teen patti sweet teen patti gold download apk teen patti gold download