Question
Download Solution PDFOn which one of the following rivers is the Tehri Hydropower Complex located?
This question was previously asked in
Patna High Court Mazdoor Official Paper (Held On: 22 Jun, 2025)
Answer (Detailed Solution Below)
Option 2 : Bhagirathi
Free Tests
View all Free tests >
Patna High Court Mazdoor: ST 1 General Knowledge & Awareness
2.1 K Users
20 Questions
20 Marks
48 Mins
Detailed Solution
Download Solution PDFThe correct answer is Bhagirathi.
Key Points
- The Tehri Hydropower Complex is located on the Bhagirathi River, a major tributary of the Ganges in Uttarakhand, India.
- It is one of the largest hydropower projects in India, with a total installed capacity of 1,000 MW (Tehri Stage I), and additional capacities from its pumped storage and downstream projects.
- The project was developed by the Tehri Hydro Development Corporation (THDC), a joint venture between the Government of India and the Government of Uttarakhand.
- The Tehri Dam, part of the complex, is a multi-purpose rock and earth-fill dam with a height of 260.5 meters, making it one of the highest dams in the world.
- This hydropower project contributes significantly to power generation, irrigation, and drinking water supply in northern India.
Additional Information
- Bhagirathi River:
- It originates from the Gangotri Glacier in the Garhwal Himalayas and is considered one of the headstreams of the Ganges.
- The Bhagirathi merges with the Alaknanda River at Devprayag to form the holy Ganges River.
- Tehri Dam:
- It is a significant component of the Tehri Hydropower Complex and provides water for drinking, irrigation, and hydroelectric power generation.
- The dam creates the Tehri Reservoir, which has a gross storage capacity of 3.54 billion cubic meters.
- Environmental Impact:
- The construction of the Tehri Dam was controversial due to concerns about seismic activity in the region and the displacement of local communities.
- Extensive rehabilitation and resettlement measures were undertaken to address the displacement of over 100,000 people.
- Pumped Storage Component:
- The Tehri Hydropower Complex includes a 1,000 MW pumped storage scheme, which helps in meeting peak power demand by storing energy during off-peak hours and releasing it during peak periods.
Last updated on Jun 17, 2025
-> The Patna High Court Mazdoor 2025 Call Letter has been released on 16th June 2025.
-> A total of 171 vacancies have been released.
-> 8th/10th/12th-pass candidates are eligible for this post.
-> Applications for this recruitment were submitted online by 18th March 2025.
-> The selection process includes a Written Test, Cycling Test, Skill Test, and Interview.
-> The finally appointed candidates will be entitled to salary in the pay scale of INR 14800 to INR 40300 (Level -1).